Sunday, August 21, 2011

Helms Deep Project Pic's - FINISHED PRODUCT!!!!

Ok as you guys can tell from the title - I am VERY excited about finishing this. This has been a tremendous undertaking for me and it has been a LOT of fun - as I have heard from quite a few of my friends (and of which I am really starting to believe as well) - That I have quite a talent for this kind of thing. With that said, I hope all of you enjoy this as much as I have enjoyed building it.

Ok, Now on to the pictures.

















These first 2 pictures shows the removable section of the Deeping Wall - I made it so a 5 man Fantasy tray could move through it easily without having to reform or remove any models.
















This section of wall was added so that we could extend the table later on if we wanted to.


















These 3 pictures show the changes we have done to the front of the keep - We have added a decorative strip along the front and have connected the secret door to the ramp (still leaving enough of a gap to warrant a jump test for LOTR games)





We decided to go with a set of stairs instead of a ramp to lead up onto the second story of the keep and we also decided to leave the possibility of an armoury for the possible future expansion.

Roughly the only thing left for us to build is the drop-gate directly above the doorway - I have a general idea for it but I hadnt been able to implement it yet.

Also one of my friends is going to be doing a video of the entire project today (hopefully) so I will post the link when he's able to upload it.

There are a minimum of 2 more projects that I have in mind that will probably start surfacing pretty soon. So,until that time - Peace Out and Happy Gaming!!!!

1 comment:

  1. Don says, The paint came out good. The overall realistic look is well done.

    ReplyDelete

Thank you for visiting-Please use Family-Friendly comments please